Pile foundations are a type of deep foundation. They are formed by long, slender, columnar elements typically made from steel or reinforced concrete, or sometimes timber. A foundation is described as 'piled' when its depth is more than three times its breadth.
Pile foundations are principally used to transfer loads from superstructures, through weak, compressible strata or water onto stronger, more compact, less compressible and stiffer soil or rock at depth. They are typically used for large structures, and in situations where soil is not suitable to prevent excessive settlement.
Piles can be used individually to support loads or grouped and linked together with a reinforced concrete cap.
Pile caps can also be linked together with reinforced concrete to create a capping beam. At least three capped piles are needed to ensure stability against lateral forces (with the exception of caisson piles). Capping beams are also suitable for distributing the weight of a load-bearing wall, or of close-centred columns to a line of piles.
This differs from a ground beam which is provided between adjacent pile caps as a structural element to improve the stability of the foundation. For more information, see Ground beams.
Piles may be staggered along the beam to allow for any eccentricities that may occur in loaded conditions. If light loading is expected to result in only minor eccentricities, then the piles can be driven in a line beneath the capping beam’s centre.
The capping beam should be kept clear of the ground where the purpose of the piles is to overcome the problem of the subsoil swelling and shrinkage. This can be done by casting the capping beam on polystyrene or other compressive material, thereby allowing an upward ground movement without damage to the beam.
An economical construction method that can be adopted is to construct concrete block walls to the exact sizes of the cap. Having first backfilled the wall with soil the space can then be filled with concrete. This cuts down on the need for formwork and the extra excavation required to position it.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Getting the most out of heating systems and heat pumps
How heat pumps work and how they work best.
Plumbing and heating for successful retrofit and renovation
Low temperature underfloor systems and heat pumps.
Cost-of-living crisis and home improvement plans
Starting on the right footing and top tips for projects.
Delays on construction projects
Types, mitigation and the acceleration of works.
From Chaucer to Fawlty Towers.
Electrotechnical excellence, now open for entries.
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
New project and cultural district described in detail.
The nature of EPCs, crticism and inaccuracies.
History, issues and redesign.
From waste recycling to energy performance the hierchy.
An introduction to WERCS and WEEE responsibilities
Dealing with 2 million tonnes of waste equipment a year.
Global BACS Market: analytics and optimisation
A BSRIA glance at building automation and control systems.
What it is and how to use it.
Types of insulating plaster by binder and insulant.
Investors in People: CIOB achieves gold
Reflecting a commitment to employees and members.
Scratching beneath the surface; a guide to selection.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.